The roofing industry in Southeast Asia is evolving rapidly as urbanization accelerates and infrastructure projects expand across countries such as Thailand, Vietnam, Indonesia, Malaysia, and the Philippines. While high-quality roofing materials are essential, proper installation is equally important—if not more so—in ensuring long-term performance. The tropical climate, characterized by intense sunlight, high humidity, and seasonal heavy rains, creates extreme conditions that can quickly expose flaws in roofing systems. Surprisingly, many roof failures in this region are not due to material defects but result from avoidable installation mistakes. For building material wholesalers, project contractors, and developers, understanding these errors and adopting correct practices is critical to safeguarding investments and reputations.
Mistake 1: Incorrect Roof Slope or Pitch
In Southeast Asia’s construction landscape, roof slope design is far more than a matter of appearance—it is a critical performance factor. Many contractors underestimate its importance, assuming that as long as the roof “looks slanted,” it will perform well. However, in tropical regions with intense monsoon seasons, rainfall intensity can reach between 50–150 mm per hour, and annual totals may exceed 3,000 mm. If the slope is too shallow, water will not drain quickly enough, causing ponding on the surface. This standing water accelerates material degradation, weakens fastening points, and increases the load on the roof structure. Over time, even premium materials like ASA synthetic resin tiles, APVC anti-corrosion tiles, or FRP transparent panels will suffer premature failure if slope design is ignored.
Real-world examples illustrate the risk. In 2022, a logistics warehouse in Ho Chi Minh City was designed with a roof slope of only 8°, suitable for light rain but not for tropical downpours. Within the first rainy season, water began infiltrating along panel joints, leading to extensive damage to stored goods. Repairs required replacing 40% of the roof panels and reinforcing the steel frame, resulting in a total loss of over USD 120,000—including material replacement, labor, and business interruption.
From a technical standpoint, manufacturers like Duolong recommend a minimum slope of 15°–20° for ASA synthetic resin tiles in high-rainfall regions, with even steeper angles for larger panel spans. APVC tiles, due to their lower weight and flexibility, also require careful slope calculations to prevent “oil canning” or surface distortion under water load. FRP transparent tiles, while lightweight, must be installed with adequate slope to ensure rainwater quickly sheds off, preventing algae growth or UV-degradation in stagnant water areas.
Correct slope design also depends on regional factors. In coastal cities such as Cebu or Penang, the combination of heavy rain and high winds means water can be driven uphill along the surface. In such cases, installers should not only increase slope but also integrate extended overlaps and wind-resistant fasteners. For inland regions with lower wind loads but still high rainfall, the focus should be on ensuring precise slope consistency during installation, using string lines and digital inclinometers to avoid low spots where water can collect.
Ultimately, roof slope is not a “set once and forget” decision—it must be carefully calculated based on local climate data, roofing material type, and structural design. By following slope guidelines from trusted manufacturers and applying region-specific adjustments, contractors can extend roof lifespan by 30–50%, avoid costly repairs, and deliver long-term value to clients.

Mistake 2: Poor Overlap and Sealing
In roofing installation, overlaps and sealing are the first line of defense against water intrusion. In Southeast Asia’s tropical climate, rain rarely falls vertically—it often comes with strong lateral wind, especially during monsoon storms. This means that if the overlap between panels is too short or the sealing is poorly applied, rainwater can be driven beneath the surface even if the roof slope is correct. The problem is compounded when contractors try to save time or material costs by reducing overlap lengths, or when untrained workers apply sealant inconsistently, leaving gaps and air pockets.
The consequences can be severe. In 2021, a beachfront villa project in Bali opted for a reduced overlap of only 100 mm instead of the manufacturer’s recommended 180 mm to “speed up installation.” Within the first rainy season, wind-driven rain penetrated through the joints, causing moisture to seep into the underlayment and wooden roof deck. Mold growth appeared within weeks, and repairs required stripping the roof, replacing warped decking, and reinstalling the tiles—all while the villa was under booking commitments. The total financial loss exceeded USD 85,000, not including damage to the property’s reputation.
Best practice dictates following the overlap specifications provided by the roofing manufacturer—typically 150–200 mm for most ASA synthetic resin tiles and APVC panels in tropical regions, and up to 250 mm in high-wind coastal zones. Sealants used must be UV-resistant, weatherproof, and compatible with the roofing material to prevent chemical reactions that reduce adhesion over time. For FRP transparent tiles, overlaps must also account for thermal expansion to avoid stress cracks at the seal points.
Beyond technical measures, installation teams must adopt a consistent sealing process. This includes cleaning the overlap area of dust or moisture before applying sealant, using the correct bead size, and pressing panels firmly into position to ensure even compression of the sealant. For critical projects such as airports, hospitals, or data centers, double sealing—applying one bead inside the overlap and another along the outer joint—provides additional redundancy against leaks.
In short, poor overlap and sealing is not just a minor workmanship flaw—it is a structural vulnerability. Investing time and resources in proper overlap and sealing practices ensures the roof performs reliably under Southeast Asia’s extreme weather, protecting both the building and the contractor’s professional credibility.
Mistake 3: Wrong Fasteners or Insufficient Fixing Points
Fasteners are the invisible backbone of any roofing system, holding panels securely in place and ensuring they withstand both everyday loads and extreme weather events. In Southeast Asia’s humid and often coastal climate, the choice of fasteners can make or break a roofing installation. Using the wrong type—such as untreated steel nails in a salt-laden environment—leads to rapid corrosion, loss of structural integrity, and eventual panel displacement. Even when corrosion-resistant fasteners are used, inadequate fixing points can cause uneven load distribution, increasing the risk of uplift during storms.
A case in point occurred in 2020 with a mid-sized factory in Cebu, Philippines. The contractor used basic zinc-coated screws without additional anti-corrosion treatment, and spaced fixing points 1.5 meters apart instead of the recommended 0.8–1.0 meters. Within nine months, coastal winds and airborne salt caused significant corrosion, and several panels were torn loose during a tropical storm. Not only did the roof require emergency repairs, but production was halted for two weeks, resulting in losses exceeding USD 200,000.
Best practice begins with selecting the right fastener material. Stainless steel screws (grade 304 or higher) are ideal for most coastal applications, while hot-dip galvanized fasteners can be suitable for inland regions with lower corrosion risk. For ASA synthetic resin tiles and APVC panels, fasteners should feature weatherproof washers to prevent water ingress through the fixing hole. FRP transparent tiles require fasteners with broad washers to distribute pressure evenly, reducing the risk of cracking.
Equally important is the quantity and placement of fixing points. Each panel should have enough fasteners to secure it against both wind uplift and thermal expansion stress. In high-wind coastal areas, adding extra fixing points along panel edges is recommended. All fasteners must be installed perpendicular to the panel surface to ensure even compression on the washer, avoiding localized stress that could cause leaks.
Contractors should also remember that fasteners are not a “set and forget” component. Periodic inspections—particularly after storm seasons—are necessary to identify early signs of corrosion or loosening. For large commercial projects, implementing a maintenance schedule that includes torque checks on fasteners can significantly extend roof lifespan and reduce emergency repair costs.

Mistake 4: Neglecting Thermal Expansion Gaps
Thermal expansion is a natural physical phenomenon that occurs when roofing materials are exposed to temperature changes. In Southeast Asia, roof surfaces can heat up to over 60°C under direct midday sun, then cool rapidly during afternoon rainstorms—a temperature swing of 30–40°C in just a few hours. Plastic-based roofing materials such as ASA synthetic resin tiles, APVC anti-corrosion panels, and FRP transparent sheets can expand and contract by as much as 2–3 mm per meter under these conditions.
When installers fail to leave adequate expansion gaps, the resulting stress has nowhere to dissipate. Over time, this can cause a range of problems: tiles may warp or buckle, fasteners may shear off, sealant joints may crack, and panels can even split. In 2019, a large agricultural warehouse in Johor, Malaysia experienced exactly this issue. The contractor installed APVC panels flush against each other with no expansion allowance, believing the “firm fit” would improve strength. Within 18 months, multiple panels had warped, lifting edges and breaking sealant lines. The roof leaked in over a dozen spots, forcing the owner to replace more than 500 square meters of roofing.
Manufacturers typically recommend leaving 2–3 mm of space between panels for every meter of length in plastic-based roofing, and slightly more in areas with higher temperature extremes. Expansion allowances should also be provided around penetrations such as vents, chimneys, and skylights. For FRP transparent panels, expansion gaps are especially important, as the material’s high thermal expansion rate combined with brittleness makes it prone to edge cracking if restrained too tightly.
Best practices include pre-drilling slightly oversized holes for fasteners—1–2 mm larger than the screw diameter—to allow movement without stressing the panel. Washers should be used to maintain a watertight seal while still permitting slight shifting. Installers must also avoid over-tightening screws, as this compresses the panel and reduces its ability to move.
By respecting thermal expansion, contractors not only prevent costly repairs but also ensure the roof maintains its intended appearance and structural integrity over decades. Neglecting it, on the other hand, sets the stage for slow but inevitable damage that may not be visible until it becomes a major problem.
Mistake 5: Skipping Waterproof Underlayment in Coastal Areas
In coastal construction across Southeast Asia, roofing faces some of the most challenging conditions—high humidity, salt-laden air, and frequent tropical storms. While the visible roof surface (such as ASA synthetic resin tiles, APVC anti-corrosion panels, or FRP transparent sheets) plays a critical role in weather protection, it is only the first barrier. A properly installed waterproof underlayment beneath the surface acts as a secondary line of defense, preventing water from reaching the structural layers when wind-driven rain forces moisture past joints or fastening zones.
When this underlayment is omitted, even small points of water entry during extreme weather can penetrate directly into the roof deck. Over time, this trapped moisture accelerates corrosion in metal framing, rots wooden substrates, and promotes mold growth in insulation. For example, in 2018, a seaside resort project in Da Nang, Vietnam decided to omit the underlayment in order to reduce construction time and costs. After only two typhoon seasons, high winds and wind-driven rain pushed water through fastening zones and panel overlaps. Without a secondary barrier, moisture saturated the plywood decking, leading to widespread structural damage. The owner had to remove the entire roof, replace compromised components, and install a proper underlayment—at a cost of over USD 300,000 and with six months of operational downtime.
Best practice in coastal regions is to install a high-performance waterproof underlayment made from materials with excellent tear resistance and salt corrosion resistance, such as synthetic polymer membranes or butyl rubber sheets. These materials maintain flexibility and adhesion even in extreme humidity. For FRP transparent panels, UV-stabilized underlayments help protect against heat-induced degradation.
Quality installation is just as important as material choice. Underlayment sheets should overlap by at least 100–150 mm, with all seams sealed using waterproof adhesive tape. The membrane should extend past eaves and gable ends to channel water away from vulnerable areas, and in high-wind zones, mechanical fastening in addition to adhesives ensures the underlayment remains in place during storms.
Skipping the waterproof underlayment in coastal projects may appear to save costs in the short term, but it exposes the building to significant long-term risks. In Southeast Asia’s harsh coastal climate, a well-installed underlayment is not an optional extra—it is an essential safeguard for both the structure and the investment.

Impact on Project Costs and Reputation
The financial consequences of roofing installation mistakes in Southeast Asia go far beyond the cost of materials. In many cases, the real loss comes from operational downtime, structural repairs, and reputational damage that can last for years. A leaking roof in a commercial building may force tenants to close operations temporarily, resulting in lost rental income for the property owner. For manufacturing facilities, downtime can mean missed delivery deadlines, contractual penalties, and reduced client confidence.
Repairing a poorly installed roof is rarely straightforward. It often involves removing significant portions of the existing structure, replacing damaged decking or insulation, and reinstalling both the underlayment and surface materials. Labor costs can escalate quickly, especially if the work requires specialized crews or must be carried out under tight deadlines. In high-demand sectors like hospitality or logistics, the indirect losses from disrupted business can surpass the direct repair costs.
Reputation damage can be even more costly in the long run. Contractors known for delivering reliable, weather-resistant roofing solutions are more likely to win government tenders, large-scale commercial projects, and repeat orders from wholesalers. Conversely, a record of premature failures—regardless of whether the fault lies with materials or installation—can discourage future clients. For suppliers and manufacturers, association with failed projects can undermine years of brand-building efforts.
In Southeast Asia’s competitive construction market, protecting both the project’s financial viability and the stakeholders’ professional credibility requires a proactive approach: strict adherence to installation guidelines, climate-specific design adjustments, and thorough quality control at every stage. The cost of prevention is always lower than the cost of remediation.
Duolong’s Recommended Best Practices
Drawing on years of manufacturing and project support experience in Southeast Asia, Duolong has developed a set of best practices that address the region’s unique roofing challenges. These guidelines not only help prevent the five common installation mistakes, but also optimize roof performance over decades of use.
For ASA synthetic resin tiles, Duolong recommends maintaining a slope of at least 15°–20° in high-rainfall areas, increasing the angle for longer panel spans. All overlaps should follow manufacturer specifications—typically 180 mm in standard areas and up to 250 mm in high-wind coastal zones. Fasteners must be stainless steel grade 304 or above, equipped with weatherproof washers, and installed perpendicular to the panel to ensure even compression. Expansion gaps of 2–3 mm per meter should be allowed to accommodate thermal movement, with oversized pre-drilled holes to prevent stress cracking.
For APVC anti-corrosion panels, corrosion-resistant fasteners are a must, particularly in coastal or industrial zones with high airborne contaminants. Fixing points should be spaced between 800–1000 mm, with extra fasteners at panel edges in areas subject to high wind uplift. Overlaps should be sealed with UV-resistant, non-acidic sealants to avoid long-term chemical degradation. As with ASA tiles, thermal expansion allowances must be factored into both longitudinal and transverse joints.
For FRP transparent sheets, handling during installation is critical to avoid scratches that may reduce optical clarity or UV resistance. Slope should be carefully calibrated to ensure quick water runoff and minimize algae growth. Expansion allowances are even more important due to FRP’s higher thermal expansion rate; oversized fixing holes and broad washers help distribute load and prevent stress points. In coastal areas, a UV-stabilized waterproof underlayment should be installed to protect the structure from both moisture ingress and heat-related degradation.
Across all material types, Duolong emphasizes comprehensive installation training for contractors and site supervisors. We provide bilingual (English/local language) installation manuals, on-site demonstrations, and quality inspection checklists tailored to Southeast Asian climates. By ensuring every installer understands and applies these guidelines, projects achieve maximum durability, reduced maintenance costs, and stronger client satisfaction.

Training and Supervision
Even with high-quality materials and clear technical guidelines, successful roofing projects in Southeast Asia ultimately depend on proper execution on-site. Worker skill levels can vary significantly across the region, especially in remote areas where construction labor is often seasonal or sourced from multiple subcontractors. Without structured training and supervision, even the best roofing products can underperform due to inconsistent installation practices.
Duolong recognizes this challenge and has developed a structured training approach for its partners. The process begins with bilingual installation manuals—written in English and localized languages—so that crews can understand step-by-step instructions without ambiguity. For large projects, Duolong provides on-site demonstrations where technical specialists train contractors on key techniques, such as correct overlap alignment, sealing application, and fastener placement. These demonstrations also address common mistakes directly, showing installers how small oversights can lead to costly failures.
Supervision plays an equally vital role. A quality assurance checklist should be implemented at multiple stages of the project: after the framing is completed, after the underlayment is installed, and after tile or panel installation. Supervisors must confirm slope accuracy, overlap lengths, and fixing patterns before approving each stage. In government or large-scale commercial projects, engaging a third-party roofing consultant can provide additional assurance by auditing installation practices against international standards.
Furthermore, Duolong encourages project owners to establish a post-installation maintenance protocol. Regular inspections—especially after typhoon or monsoon seasons—help detect loose fasteners, degraded sealants, or localized ponding before they escalate into major problems. This proactive approach not only extends roof lifespan but also reduces lifecycle costs for owners and contractors alike.
By combining structured training, rigorous supervision, and ongoing maintenance, stakeholders can ensure that roofing systems in Southeast Asia deliver maximum durability and value, even under the region’s extreme climate challenges.
Conclusion
Roofing projects in Southeast Asia face some of the most demanding environmental challenges in the world. From torrential monsoon rains and coastal salt exposure to intense tropical heat, every project requires more than just quality materials—it requires precise installation, rigorous supervision, and a commitment to long-term performance.
The five common mistakes—incorrect slope design, poor overlaps and sealing, unsuitable fasteners, neglecting thermal expansion gaps, and omitting waterproof underlayment—are not merely technical oversights. They are costly errors that can shorten roof lifespan by years, inflate maintenance budgets, and damage professional reputations. Yet, every one of these mistakes is preventable when contractors and suppliers follow proven guidelines and invest in proper training and supervision.
For wholesalers, developers, and project managers, partnering with a trusted supplier makes all the difference. Duolong not only manufactures ASA synthetic resin tiles, APVC anti-corrosion panels, and FRP transparent sheets to meet the region’s demanding climate conditions, but also provides installation manuals, on-site training, and technical support. This combination of advanced products and professional guidance ensures that projects achieve maximum durability, minimal lifecycle costs, and stronger returns on investment.
In a construction market as competitive as Southeast Asia’s, success belongs to those who deliver reliability. By avoiding common installation mistakes and adopting best practices, stakeholders can build roofing systems that stand strong for decades. Duolong is committed to being your partner in that success—providing both the materials and the expertise you need to protect your projects, your clients, and your reputation.